Chiawa Pipeline

Project value: US$2.5 million
Size/capacity: Ø1 100mm to Ø1 300mm

In Zambia, MBB conducted the water hammer analysis and detailed design of a pipeline and surge alleviation structures, plus construction supervision of large bore glass reinforced plastic (GRP) pipelines, ranging from Ø1 100mm to Ø1 300mm diameter over a distance of 6 500m.