Giba Banana Project

Project value: US$ 1.4 million
Size /capacity: 450 ha
The GIBA development project (Zone 1) is a 450 Ha banana development.  The bulk water supply system consist of a new 105 000 m3 HDPE- lined dam, and a 4.7 km gravity bulk water supply pipeline (500mm diameter) from the dam to the new filtration system, and beyond.  260 Ha of In-field micro-sprinkler irrigation has been installed to date.